Joined
·
499 Posts
Been working on this for about a week now. The rotted area is dead center around the ski locker between the helm and front passenger seat. I tore out the rug, that I plan to replace anyhow, and marking out the areas to be cut away, making sure to not cut into the stringers and bulkheads. It's been messed with before unfortunately, and the guy who did wasn't trying really hard to do it right. He replaced a section with regular plywood and just slammed some mat and resin over it, not bothering to scuff the area down with 80 grit paper or to encapsulate the wood in resin to start with.
I cut out everything I needed to and got to work measuring and figuring out angles. I had a 1/2 sheet of 5/8" plywood in the garage to make the patch and a bunch of 3/4" plywood scraps to make the cleats for the fix. Got it all cut and set in place, and traced out the ski locker frame. I cut out the ski locker and made up the cleats to hold up the new floor.
Got it all installed yesterday evening and almost finished it up this afternoon. I used at least 50- 1.25" SS wood screws and 24- 1/4"-20 phillips drive bolts, fender washers and nylon lock nuts to hold it all together. My 200# frame can't get the new floor to budge at all so mission accomplished!
I did run out of resin and still need to scuff down the forward floor and the area aft of the patch. I want to redo the resin barrier to keep the water from getting into the floor plywood before I install the carpet for keeps. Here's a bunch of photos of the job to date....
I installed the Stars and Bars this afternoon too, was a gift from my Dad for my birthday last year. Adds a touch of class to the stern! :2th:
I cut out everything I needed to and got to work measuring and figuring out angles. I had a 1/2 sheet of 5/8" plywood in the garage to make the patch and a bunch of 3/4" plywood scraps to make the cleats for the fix. Got it all cut and set in place, and traced out the ski locker frame. I cut out the ski locker and made up the cleats to hold up the new floor.
Got it all installed yesterday evening and almost finished it up this afternoon. I used at least 50- 1.25" SS wood screws and 24- 1/4"-20 phillips drive bolts, fender washers and nylon lock nuts to hold it all together. My 200# frame can't get the new floor to budge at all so mission accomplished!
I did run out of resin and still need to scuff down the forward floor and the area aft of the patch. I want to redo the resin barrier to keep the water from getting into the floor plywood before I install the carpet for keeps. Here's a bunch of photos of the job to date....
I installed the Stars and Bars this afternoon too, was a gift from my Dad for my birthday last year. Adds a touch of class to the stern! :2th:
Attachments
-
182 KB Views: 128
-
214.6 KB Views: 99
-
205.4 KB Views: 102
-
210.5 KB Views: 117
-
250.1 KB Views: 138
-
119 KB Views: 112